AI Reply & Compose
AI reads incoming emails and generates replies in 5 styles: Polite, Standard, Concise, Inquiry, and Decline. 11 business templates available in one click.
Email. Marketing. AI. Collaboration.
Everything your team needs — unified in one platform.
25+ features. One login. Zero context switching.
No account required All features accessible Data not saved
Mail, AI, Chat, Tasks, Workflows, Marketing — all in one interface
Beyond email — a unified business communication operating system
AI reads incoming emails and generates replies in 5 styles: Polite, Standard, Concise, Inquiry, and Decline. 11 business templates available in one click.
Create tasks directly from emails. Gantt charts, progress tracking, member assignment, and dependencies. Email and tasks — finally unified.
Real-time messaging built right into your mail client. DMs, group channels, and file sharing — no app switching required.
Handle purchase approvals and document sign-offs inside your inbox. Multi-step approval routes with reject and return support.
Built-in list management, drag-and-drop builder, campaign delivery, step emails, trigger emails, and open/click tracking with analytics.
Two-factor authentication, away lock, IP blocking, and one-click login URLs. Enterprise-grade security out of the box.
Real-time sync with Google Calendar. Create events and schedule Google Meet calls directly from your mail view.
Native app optimized for iPhone and iPad. Push notifications and Face ID support for mail on the go.
Native app for Android phones and tablets. Push notifications and fingerprint authentication for anywhere access.
Not just another email client. A new infrastructure.
World's first system enabling multiple mail servers under a single domain. Breaks the 30-year limitation of SMTP's one-domain-one-server architecture through mathematically reversible address transformation.
DNS-based mutual trust authentication between domains. Both sender and receiver must declare trust — unilateral declarations are rejected. Spam blocked before it reaches the inbox, by default.
All mail server configurations encrypted with AES-256-GCM. Postfix reads zero plaintext files — a custom C# Policy Server decrypts on-demand via socketmap protocol. Zero exposure at infrastructure level.
AI-powered threat detection running as an Rspamd plugin. Stealth rejection disguised as "User not found," quarantine with header injection, and real-time content analysis for investigation tool detection.
No account required. No credit card. Just click.
No account required Demo environment only